Case Study

Yokogawa Provides CENTUM CS 3000 and ProSafe-RS for the Largest LNG Terminal in Europe

Yokogawa Provides CENTUM CS 3000 and ProSafe-RS for the Largest LNG Terminal in Europe

Pages 4 Pages

Location: Order Date: Commercial Operation: Industry: http://www.yokogawa.com/suc/ SUCCESS STORY South Hook, Milford Haven, UK March 2005 April 2010 LNG Executive Summary The demand for natural gas is growing rapidly and at the same time indigenous gas production in European Union is going down. Experts predict that the resulting import requirements in the European Union in 2030 will be between 1.5 and 2 times the import amount of 2007. One o

Join for free to read