Case Study
Yarwun 2 Project, Gladstone, Australia
Page 1 Yarwun 2 Project, Gladstone, Australia Data project sheet ALE-03-S0011 Web: www.ale-heavylift.com ALE were contracted by Bechtel to transport all Heavy Items for the Yarwun 2 Project in Gladstone. Items included Mud Wash Tanks weighing 300Te and 24m Diameter along with 60m Long Conveyors. ALE carried out engineering studies for each move on site. ALE were on site for a period of over 12 months supporting the Project. T