Case Study
XR-5 Vapor Barrier
XR-5 Vapor Barrier LOCATION: La Mesa, CA TIMEFRAME: April 2009 PRODUCTS: XR-5 Vapor Barrier PROJECT PARTNERS Owner: Starbucks Contractor: Kahl Construction Installation: Lay eld Challenge Starbucks Co ee was planning on installing a retail store in La Mesa, CA. The selected site was an old gas station that had been demolished years before. There was a new gas station directly adjacent to the site as well. Starbucks became concerned about the carbon transmission from the site and did not want that leaking through the foundation and into their retail unit. This was a very challenging job for Lay eld, since there were two retail units on the site and Starbucks wanted both units to have the vapor barrier under the foundation. The foundations of the two units were notgoing to be poured at the s