WY DOT US 18 Rehabilitation

WY DOT US 18 Rehabilitation

Pages 1 Pages

PROJECT WY DOT US 18 Rehabilitation LOCATION US 18, North of Lusk, WY N43° 00’33.6”, W104° 21’ 54.6” APPLICATION Reinforced asphalt overlay to retard reflective cracking PRODUCT CompoGrid® 100 QUANTITY 300,000 m² OWNER Wyoming DOT CONTRACTOR McMurray Ready Mix – Asphalt Div. ENGINEER WY DOT INSTALLATION DATE May 2010 OVERLAY DESIGN 5.5 cm thick Continuous Grade mix – 19 mm nominal CompoGrid® 100 5cm HMA – 19 mm nominal PROJECT DETAILS This was