WWTP Rehabilitation Project Stays on Schedule with Sludge Pumping System

WWTP Rehabilitation Project Stays on Schedule with Sludge Pumping System

Pages 1 Pages

WWTP Rehabilitation Project Stays on Schedule with Sludge Pumping System PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND A Wastewater Treatment Plant in Georgia required sludge removal for their primary clarifier in order to move forward with a rehabilitation project. The clarifier was densely packed with sludge too viscous to pump with the equipment available in their maintenance department. The WWTP wanted to keep the sludge as thick as possible as it was removed; loosening it with water would add weight and increase hauling costs. OUTCOME Rain for Rent presented a plan to the WWTP that would utilize a Fast Flow pump specifically designed to move very viscous material efficiently. The temporary pump and hose system was quickly approved, de