Case Study
WWTP Opole, Poland
CASE STORY Belt Dryer BD 3000/6, 2 lines In 2013, Haarslev has built 2 drying lines with the belt dryer BD 3000/6 with a water evaporation capacity of 2100 kg H2O /h in the sludge treatment plant of the municipal WWTP Opole in Poland. Both dryer lines can operate independently. Cooling water of the existing CHP with an approximate temperature of about 95 °C is used in an indirect heating system with heat exchanger to heat up the dryi