Case Study

WWII-era Construction Restricts Options

WWII-era Construction Restricts Options

WWII-era Construction Restricts Options Project Name Project Location Completion Date The Team General Contractor Architect HVAC Engineer HVAC Contractor case study September 2010 limitations. Since multiple indoor units (up to 32) can be connected to a single outdoor unit, Goto Construction minimized the impact on the existing architecture of the historically significant buildings. However, the biggest advantage of the Mitsubishi Electric

Join for free to read