Case Study

Wrigley Field

Wrigley Field

Pages 1 Pages

Wrigley Field - Outfield Bleacher Expansion Chicago, Illinois Utilizing two IMT 220 drill rigs and a BG39 drill rig, Case Foundation Company completed the installation of 69 caissons supporting the historic Wrigley Field outfield bleachers during the winter of 2014. A total of 63 belled caissons were installed with shafts ranging from 3’-0” to 6’-0”diameter and bells ranging from 6’-0” to 15’-0”. Belled caissons were founded on har

Join for free to read