Worthington Steel

New Annealing Furnace and Line Modifications Worthington Steel 419-537-1900 dunbarmechanical.com Dunbar first served Worthington Steel when the firm built their multi-story galvanizing operation in Delta, Ohio in 1996. Dun- bar installed the: • Pro-Eco pickle line • hot dip galvanizing line • Selas furnace • all associated piping • all structural steel • slitter line Two decades later, Worthington brought Dunbar back to replace 90-feet of the annealing furnace, adding 21 feet in the process to further improve quality and galvanzing capac- ity. Dunbar’s crews minimized downtime by pre-assembling platform sections as modules on the production floor and set 90-tons of steel plus 90-feet of pre-heat modules, includ- ing all terminal equipment. Working around the clock, crews removed