Case Study

Workington’s Brand-Newsports Facility Kitted-Out With High-Efficiency LED System

Workington’s Brand-Newsports Facility Kitted-Out With High-Efficiency LED System

Pages 9 Pages

WORKINGTON LEISURE WORKINGTON’S BRAND-NEW SPORTS FACILITY KITTED-OUT WITH HIGH-EFFICIENCY LED SYSTEMABOUT THE CLIENT Workington’s brand-new leisure centre is due to open the public at its new location, with Dextra Lighting’s precision-engineered LED luminaires and digital lighting controls, to provide a sustainable and safe sports environment for the people of Allerdale. With the development plans and new location approved, 1.5m from Sport England and 1.5m from Allerdale Borough Council were poured into creating a state-of-the-art leisure centre to replace the Brow Top facilities in Moorclose, Cumbria. With a total budget of 11.3m, the design for the new building was set to a high-specification, with the lighting expected to deliver future- proof standards of energy efficiency and pe

Join for free to read