Case Study
Working As A Specialist Sub-Contractor
Working as a specialist sub-contractor we designed and built a standalone Grade D cleanroom for the repair and painting of composite wing components for the A350. The facility was constructed within an existing industrial unit with live overhead cranes in operation. The fully co-ordinated design concluded in a steel portal frame which could support the HVAC plant and provide restraint to the 8 meter composite panels. The composite panel system wa