Case Study
Woodbridge School 6th Form Centre
As part of a phased redevelopment, a new building has been constructed to replace the existing 6th Form Centre and teaching blocks. Located adjacent to a listed building, the intent was to deliver a ‘low energy’ building. Following detailed thermal modelling, an active ventilation system was provided with fresh air rates varied to react to internal temperature and air quality conditions. Under-floor heating is provided throughout with ai