Woodberry KSS4

Woodberry KSS4

Pages 1 Pages

www.coinford.co.uk GROUNDWORK AND CONCRETE FRAME SPECIALISTS Woodberry KSS4 CLIENT: Berkeley Homes (North East London) Ltd CONTRACT VALUE: £9.5 Million HACKNEY, LONDON, N4 2SB CASE STUDY Acting as Principal Contractor for the initial 35 weeks CCL install both contiguous and bearing piles, excavated and constructed basement car park. Construct frames up to 18 floors, utilising precast columns and jump form construction for the cores. Titan Screen Saver was installed on the upper floors of the tower. SCOPE OF WORKS Principal contractor role Piling, both contiguous and bearing piles Bulk excavation Basement construction Podium construction Frame & upper floors up to 18 floors External W orks Lightening protection Provision and operation of T ower Cranes