Case Study

Wood Fiber

Wood Fiber

Pages 1 Pages

 Application Info – Beloit 36 DD Refiner  Problem – Refiner sleeve had excessive wear below the lantern ring. Plant was unable to maintain packing leak rate and experienced short packing life. To replace sleeve also requires significant downtime of 8 hours. – Costs to replace sleeve are as follows. Sleeve Cost $1,500.00 Labor 4 men 8 hours $22/hour each $704.00 Packing 6 rings 1727 and l

Join for free to read