Case Study
Wolf Lake Trail Crossings
Challenge For the Wolf Lake South Trail in Hammond, Indiana, swale crossings were needed in several low-lying areas to prevent water from overtopping the trail and hindering natural drainage. “We’ve seen other trails in the area run into this issue and wanted to learn from it before it became a problem,” said Dean Button, engineer and project manager at SEH, Inc. Concrete box culverts and perforated metal pipes were also considered. Box culvert options would require a costly increase to the trail profile elevation, while smaller diameter pipes would face debris buildup potential. Solution Six identical boardwalk crossings, each 20’ in length, were designed and installed throughout the Wolf Lake South Trail to allow proper drainage into the lake. The PermaTrak clear span boardwalk cr