Case Study
WL Plastics Completes 21.2 Mile Long Pipeline, Enclosing Open Canals With Buried Pressurized HDPE Pipe In Roosevelt Utah.
WL Plastics Completes 21.2 Mile Long Pipeline, Enclosing Open Canals With Buried Pressurized HDPE Pipe In Roosevelt Utah.
WL PLASTICS COMPLETES 21.2 MILE LONG PIPELINE, ENCLOSING OPEN CANALS WITH BURIED PRESSURIZED HDPE PIPE IN ROOSEVELT UTAH. HDPE PIPE CHOSEN TO IRRIGA TE 53,000 ACRES OF FARMLAND THE PROJECT: Since 1905, the shareholders of the Dry Gulch Irrigation Company of Roosevelt, Utah have received irriga- tion water to over 53,000 acres of farmland through canals and open water- ways. In 2010 a plan for an enclosed, pressurized water distribution