Case Study

Winter Maintenance

Winter Maintenance

Pages 1 Pages

Information Technology Problem Audits are carried out against the winter maintenance routes and drivers need to be trained and become familiar with the routes before the winter season begins. There is also a requirement to optimise the routes which, although they may appear to take the same amount of time to drive, experience shows this is not the case, as anyone using satellite navigation well knows. With new routes being planned and old routes revised, this was an ideal time to review the whole process. Solution In October 2009 MGWSP purchased GeoVideo. The system provides Northamptonshire Highways with a simple, complete and fl exible way in which they can capture video data from the network which is time, date and position stamped and does not require any specialist veh

Join for free to read