Case Study

WIND IS POWER

WIND IS POWER

Pages 2 Pages

WIND IS POWER WINDEMULLER Partners in your success windemuller.us CHALLENGE CLIENT Heritage Sustainable Energy PROJECT Big Turtle Wind Farm PROJECT SIZE $5.7 million LOCATION Huron County, Michigan The Big Turtle Wind Farm design phase started in July of 2013 and once completed, from the design phase through construction, it would be 1 of 9 Wind Farms in Huron County. In order to make the plan a reality, a substation needed to be designed that met the voltage and power requirements of the International Transmission Company (ITC) and Midwest Independent System Operator (MISO). SOLUTION This may sound like a difficult job, but for Windemuller it was a challenge gladly accepted. After successfully completing 2 other wind farms, it was time to take on another. The project was gree

Join for free to read