Wheatland Farms WWTP Lincoln University, PA Capacity: 37,500 GPD Date Completed: May 2011 Description: The Wheatland Farms WWTP was built by Dutchland in 2004 as a precast post-tensioned concrete extended aeration treatment plant. It was originally designed to treat 128,000 gallons per day. However, due to the changing needs of the community and the customer, Dutchland altered the design of the plant in 2011 to treat 37,500 gallo