Case Study

WestLotto Reduces Backup and Recovery Times by Up to 98% with Cohesity

WestLotto Reduces Backup and Recovery Times by Up to 98% with Cohesity

Pages 2 Pages

CASE STUDY DR. FRANK WALLOW, Department Head, IT Production, WestLotto “Because of a very complex licensing model, we got used to seeing our license and maintenance costs increase on a regular basis with our legacy system. In addition to the lower TCO, further benefits of deploying Cohesity became apparent to us.” CASE STUDY – WestLotto INDUSTRY Gaming USE CASE Backup and Recovery CHANNEL PARTNER Computacenter WestLotto Reduces Backup and Recovery Times by Up to 98% with Cohesity Introduction WestLotto is Germany’s largest lottery provider and the control center for the transnational lottery, Eurojackpot, including 18 European countries. The company has been in operation for more than 60 years. The 350 employees at the WestLotto headquarters in Münster look after more tha

Join for free to read