Case Study

Westbay System Reduces Construction Costs by 65%

Westbay System Reduces Construction Costs by 65%

CHALLENGE OCWD had determined that information on the piezometric level and water quality of each aquifer layer was required to optimize management of the recharge, storage, and recovery of groundwater. SOLUTION A cost analysis indicated that for 10 zones through a depth of 1,500 ft, the Westbay System instrumentation would result in a total cost 55% to 65% lower than that for clustered wells or two five-well nests RESULTS The increased d

Join for free to read