Case Study

Wessex Water

Wessex Water

CASE STUDY CLIENT: Wessex Water Site: Wells STW Date: April 2012 Background The Wells inlet works had been experiencing significant operational problems due to a high number of wash press breakdowns. This was resulting in excessive downtime and consistently high maintenance costs. A further complication existed in the high-­-energy load that was required to drive the number of motors servicing these units. With the existing launder channel fully operation it was necessary to ensure that any solution could be re