Case Study

Wessex Water, Avonmouth Sludge Conveyor

Wessex Water, Avonmouth Sludge Conveyor

Pages 1 Pages

CLIENT: CONTRACT VALUE: CONTRACT TYPE: SECTOR: DESCRIPTION OF WORK: ACIEM (as Damar Group) delivered the design (subcontracted to AECOM), supply and installation of a bridge and 45m long belt conveyor which rose from 5m at the base to a height of 15m. The belt conveyor was required to move compliant sludge cake into a silo. We also installed additional screw conveyors, at the base and at the silos. The installation of these screw conv

Join for free to read