Case Study

Well Intervention

Well Intervention

Pages 1 Pages

Objectives • An operator in Asia were experiencing reduced production rates on a recently drilled and completed well – remedial ops were to perform a routine N2 lift with coil tubing • N2 lift through 1.5” coil tubing string – whilst running in hole to the target depth of 2,996 meters, the coil tubing string got stuck at 2,986 meters • Expro were asked to provide a radial cutting torch (RCT) suitable to cut coil tubing Expro Excellence • Rapid mo

Join for free to read