Case Study
Well Abandonment
Objectives • Expro worked with BP to develop engineered solutions for successful rigless abandonment of Miller Platform wells Expro Excellence • Services supplied included drift runs to ascertain through-bore access, and acquisition of pressure and temperature data – crucial in defining the final well abandonment design and methodology • Due to the presence of deep set control lines, production tubing was pulled from seven of the drilling slots,