Watford City High School Event Center Regional Stormwater Facilities Watford City High School Event Center Watford City proposed to construct a new High School and Event Center (HS/EC) along with extensive improvements to serve the new HS/EC and surrounding area. Since the HS/EC was located away from any existing roadway system, the project included design of nearly 2.5 miles of roadways that would provide access from two existing arterial roadways. For utilities, the project included new water, sanitary, and storm utilities along the entire 2.5 miles of roadways, including planning for capacity and locations for future connections. Storm sewer improvements included designing new trunk-line storm sewer and street inlet network, with storm sewer sizes ranging up to 60 inches. The storm sew