Case Study

Water treatment plant - Lichte

Water treatment plant - Lichte

Pages 1 Pages

Water treatment plant - Lichte Waste water treatmeant plant in Lichte Installed Valves A Population of 10,400 people, including the commercial and industrial areas as well as tourism, live in the catchment area of the completed Leibis Dam. To ensure that the quality of the water meets the requirements of drinking water supply and can be sustainably improved downstream of the dam, the Lichte Waste- water Treatment Plant was built. To exclu

Join for free to read