Case Study

Water Treatment Facility’s Control Panel Stabilized Without Disruption Of Intricate Wiring

Water Treatment Facility’s Control Panel Stabilized Without Disruption Of Intricate Wiring

Pages 4 Pages

Ram Jack South Carolina www.ramjackse.com | 866-735-3085 Ridgeway, SC Water Treatment Facility’s Control Panel Stabilized Without Disruption of Intricate Wiring 2015 CASESTUDY Type: Commercial | Issue: SC201511 RAM JACK LOCATION:2 Ram Jack South Carolina proposed the installation of three helical piles to lift and stabilize the concrete pad on which the control panel rested, two on the sides and one in the front. The piles would be used

Join for free to read