Collahuasi Mine required to transport water that needed to cross mining crossroads, where the pipes were continuously exposed by the heavy trucks that circulate the area. In the past, the client used HDPE pipes that created a bottleneck on the crossroads. To gain time they reinforced them with steel pipes that acted as steel protectors for the pipes. But still, the solution was very expensive. The Solution - Since 2012 the client decided to replace all the water HDPE pipes with Pexgol. This change brought better productivity during the installation of the lines, better performance under harsh conditions, and thanks to its mechanical properties it improved the issues reducing the bottleneck on the crossroads. The average installation time was reduced from 3-4 days to 4 hours per crossroad.