Water Supply Interconnection Design

Water Supply Interconnection Design

Pages 2 Pages

Client East Lyme, Connecticut Description East Lyme has experienced summer water shortages for more than 20 years. The current water system serves approximately 18,000 persons in the winter, but the population spikes to 30,000 in the summer. In the summer of 2008, the problem worsened when demand could not be met because two wells were offline to comply with the Department of Energy & Environmental Protection (