Case Study
Water Pump Upgrades Deliver Peace Of Mind And A $63,809 Incentive
Built in 1975, the Westin Harbour Castle offers guests a prime downtown lakefront location. In keeping with the ongoing operations requirements of a major hotel, Venkatarao Swamy, Director of Engineering, took on the project of upgrading the hotel’s cold-water booster pump system. He knew the pumps were original from the time when the hotel was built and there had been maintenance issues. The pumps were substantially oversized for the buildi