Case Study

Water-powered Drilling in the Very Sensitive Wolf Creek Dam

Water-powered Drilling in the Very Sensitive Wolf Creek Dam

Pages 4 Pages

WATER-POWERED DRILLING IN THE VERY SENSITIVE WOLF CREEK DAM DAM REHABILITATION PROJECT 2013.04 – Water-powered drilling in the very sensitive Wolf Creek dam © LKAB Wassara, All rights reserved. CASE STUDY (Photo by Courtesy Asset, U.S. Army Corps of Engineers)LKAB Wassara AB, Stockholm, Sweden WOLF CREEK DAM CASE STUDY The rehabilitation of the Wolf Creek Dam in Kentucky, USA, started in 2007. Wassaras water-powered drilling equipment was chos

Join for free to read