Case Study
Water Filtration in Boulder Business Park
Problem The detention basin was incorporated into the project design to collect excess storm water runoff from the large site. To excavate the basin, workers with Whiting Turner blasted through rock layers to get down to grade and encountered groundwater. Whiting Turner began dewatering the basin only to find that the water was contaminated with fine coal sediment seeping into the water from the surrounding deposits. Pumping the water