Case Study

Water Digester

Water Digester

Water Digester Project: Pepper’s Ferry Regional Waste- water Treatment Facility, VA Category: Wastewater Treatment System: Rhino Linings HardLine ? Application: Repair of digester lid due to rust blooms and outer skirt and weld plate seams. Job Description The digester had been converted from a floating lid to a stationary lid. The lid was 40 feet from the bottom of the digester and had a 5½ ft. floor slope with num

Join for free to read