Case Study

Wastewater Treatment Facility-Wamego KS

Wastewater Treatment Facility-Wamego KS

Pages 2 Pages

Wamego, KS Wastewater Treatment Facility Project Location: Wamego, Kansas Client: City of Wamego Challenge: Replacing a failing lagoon system and dealing with its sludge Size: 0.75 MGD flow for 3,700 people, 2.5 MGD peaking factor Solution: ClarAtor ® Clarifier with SEQUOX ® Process and MONOBELT ® Belt Filter Press Representative: Lee Durham Engineer: Pat Cox, B&G Consultants Contractor: David Stueve, Kelley & Dahlstrom Construction Operator: B

Join for free to read