Case Study

Wastewater From PTA Production

Wastewater From PTA Production

Pages 2 Pages

Benzoic acid Acetic acid Terephthalic acid Isophthalic acid Trimellitic acid Orthophthalic acid P-Toluic acid Methanol Buffer tank HRT 1 - 2 days Conditional tank HRT 0.25 hours Anaerobic reactor 8 - 15 kg COD/m 3 d COD removal Efficiency 60 - 90 % Client Wastewater from PTA production Thanks to our extensive knowledge on (petro-) chemical and pharmaceutical wastewater Biothane is the world leader in the anaero

Join for free to read