Waste Storage Canopy Building During Refurb Project
Our client was in the process of a major refurbishment at their busy recycling depot. A fast solution was needed for them to store their recycling products prior to sorting. The Canopy building needed to allow for easy access for large vehicles to operate freely within the canopy structure. - HTS INDUSTRIAL manufactured and installed a 20.00m x 15.00m L-SERIES canopy structure on a 6.20m eave height, using 40.00mm UPVC steel reinforced walling panels to 2 sides combined with a single layer PVC roof system. - The HTS INDUSTRIAL installation team built the canopy structure within 3 days on the client’s busy site, causing minimal disruption to the operation. The canopy structure will remain on site for a period of 24 months, whilst their refurbishment takes place.