Case Study

Waste-Fired Combined Heat And Power Plant

Waste-Fired Combined Heat And Power Plant

Pages 3 Pages

Waste-fired combined heat and power plant Giubiasco / Switzerland Efficient recycling and power generation thanks to InterApp HE ATING / VENTIL ATION / AIR- CONDITIONING CASE STUDYHE ATING / VENTIL ATION / AIR- CONDITIONING CASE STUDY 100 GWh / year 140,000 t / year 331 million francs GRID FEED-IN NOMINAL INCINERATION CAPACITY COSTS Orbinox KNIFE GATE VALVES AVK GATE VALVES Desponia + Aquaria BUTTERFLY VALVES BVP BALL VALVES The

Join for free to read