Case Study
Washington State Department Of Information Services
Introduction DIS Wheeler will be Washington State’s primary data center, designed to maintain state records. The project is 480,000 ft 2 and the State is pursuing LEED Gold CS (Core & Shell) certification for the data center. The data center’s cooling system includes a 1.2 million gallon water tank. Challenge Because the water tank functions as the primary cooling system for the data servers, it is critical that the tank be watertight. Al