Case Study
Washington Athletic
Project Profile Washington Athletic Club swimming pool. Current membership of the WAC numbers close to 11,000. The original 1930's building was not air conditioned. Ventilation air was supplied by two central fans and heat was provided by steam radiators and coils, with steam purchased from Seattle Steam. The 1954 addition was the first that included mechanical cooling. In 1957, air condition- ing, utilizing D/X cooling, was added to the pre-1954