Case Study

Warwick University

Warwick University

Pages 2 Pages

Requirement: Requirement: A state-of-the-art research facility was required for the new International Institute for Nanocomposites Manufacturing at WMG at the University of Warwick – the rst institute of its kind in the world. A team of 50 nanocomposite researchers works here to develop innovative manufacturing technologies to enable industry to make large-scale nanocomposite parts. Solution: Solution: By choosing a Yorkon o-site building solution from the Portakabin Group, the university was able to radically reduce the programme time to just 14 weeks on site. Designed by Cullinan Studio, the two-storey £2.3m scheme was manufactured at the Portakabin Group production centre. The 28 steel- framed modules were then craned into position on campus. The exterior walls of the modules were