Case Study
Walkway Grating
DIRECT METALS ® ® Case Study The project consisted of 22 unique part sizes totaling 90 pieces. Each piece was notched and banded to fit around the girder stiffeners and handrail posts. The grating was attached to the structure using galvanized saddle clips and self taping screws. The new Washington Street Railroad Bridge is built over Washington Street and eliminates the current at-grate railroad crossing. Construction began in 2015 and is d