Case Study

Wachovia Bank Building

Wachovia Bank Building

Pages 2 Pages

1 cooling towers. Variable Frequency Drives by ABB also contributed greatly to the achievement of the desired goals. Further, with the installation of KMC’s TotalControl software, coupled with KMC BACnet routers, ABC provided an easy-to-use, web-based workstation that facility personnel were eager to wrap their hands around. The KMC system monitors and controls nearly 3,600 physical inputs and outputs which are connected to the controller

Join for free to read