Case Study
Vulcan Steel
$86k Annual cost of waiting if not undertaking current proposal. (Average over 10 years) Vulcan Steel This proposal provides an energy consumption and cost analysis for Vulcan Steel Pty Ltd and includes a retro-fit solution which will significantly reduce emissions and costs for the facility. At Commencement NuGreen Solutions provided a survey of the site, measured the current lighting levels, and analysed existing light fittings. NuGreen were then able to prepare a full business case report which detailed the cost and benefits of this project. Based on the pre-audit survey, NuGreen proposed an upgrade of 215 fittings, which were sourced from our manufacturing partners including a 7 year protection plan warranty on fittings and 3 years on tubes. The complete upgrade will see