Case Study

Voltage Optimisation: The Horse & Groom, Surrey

Voltage Optimisation: The Horse & Groom, Surrey

10% average energy savings achieved, saving £5,683 per year, with payback under 2 years. The Horse and Groom is a family run pub occupying a characterful 500-year building situated within Hare Hatch, Twyford. GWE were approached to assess the viability of implementing voltage optimisation to reduce the hotel’s energy consumption, and therefore costs. Analysing electricity bills and carrying out a survey established the hotels peak energy consumption and Maximum Demand. This highlighted that the electricity supply was far greater than required. Fitting an optimiser to meet the hotels requirements, rather than match the size of the incoming supply made great sense. This approach reduced the capital cost of the equipment, gave a higher return on investment, and resulted in a payback of unde