Case Study

Visconti Apartments

Visconti Apartments

Stormwater Detention Owner: GHP Management Engineer: Watermark Engineering Group, Inc. Contractor: Kearney Construction Co., LLC Technical Description: l 5,175 LF of 60” Diameter Aluminized Steel Type 2 l (2) Integrated Outlet Control Structures l 1,068’ LF of Slotted Drain Installation: Summer 2008 In 2008, Contech Engineered Solutions was contacted by Kearney Construction regarding a project they were biddin

Join for free to read