Case Study

Virtualization of Ovation Workstations Reduces Lifecycle Costs and Maintenance Time for Engie’s Maasvlakte Power Station

Virtualization of Ovation Workstations Reduces Lifecycle Costs and Maintenance Time for Engie’s Maasvlakte Power Station

Pages 2 Pages

POWER ©2017 Emerson. All rights reserved. PWS_010012 R2 Virtualization of Ovation TM Workstations Reduces Lifecycle Costs and Maintenance Time for Engie’s Maasvlakte Power Station RESULTS •70% reduction in workstation hardware and associated maintenance costs APPLICATION 800-MW biomass power plant equipped with a Hitachi steam turbine generator and Hitachi ultra-supercritical boiler capable of burning anthracite coal and coal waste CUSTOMER Engie Energy, Maasvlakte Power Station located in Rotterdam, Netherlands. The plant began commercial operation in 2015. CHALLENGE Engie contracted Emerson to supply an Ovation TM control system for the new-build Maasvlakte power plant during the construction procurement process. The system was delivered to site in 2012; however, it did not be

Join for free to read