Case Study

Victoria’s Level Crossing Removal Project Uses Ineight Technology To Better Manage And Control Project Documents

Victoria’s Level Crossing Removal Project Uses Ineight Technology To Better Manage And Control Project Documents

Pages 4 Pages

VICTORIA’S LEVEL CROSSING REMOVAL PROJECT USES INEIGHT TECHNOLOGY TO BETTER MANAGE AND CONTROL PROJECT DOCUMENTS Red-faced and white-knuckled – common symptoms of rush-hour commuters in Melbourne as they waited at one of the many level crossings (or rail crossings as they’re called in the U.S.). Looking to unclog some of the city’s busiest roads, the Victorian state government has taken the bold move of eliminating 75 of these dangerous and congested level crossings, including nine between the suburbs of Caulfield and Dandenong. The Level Crossing Removal Project (LXRP) and Lendlease, a leading international property and infrastructure group that is part of an alliance responsible for level crossing removals, wanted to transform the way they approached the project. Because the proje

Join for free to read