Case Study
VÖGELE Material Feeders Permit Daily Laydown Rate Beyond 5,000 Tonnes
VÖGELE feeders permit daily laydown rate beyond 5,000 tonnes. Three VÖGELE pavers worked VÖGELE Material Feeders Permit Daily Laydown Rate Beyond 5,000 Tonnes High material throughput and high-quality paving. The German A 2 motorway was widened to six lanes. Between the “Kamener Kreuz” junction and the “Bönen” exit, the MT 3000-2 PowerFeeder from VÖGELE assured a top performance and outstanding results – as continual infrared thermagrophy tests confirmed. Motorway construction projects are always a major logistics challenge. Confined conditions on the cordoned-off site, working alongside the traffic stream and high time pressure impose immense demands on both the men and their machines. For this reason, contractor Heinz Schnorpfeil Bau GmbH elected to use three VÖGELE pavers and two VÖGELE