Case Study
VELCO required a three hop Microwave Radio System constructed to interconnect several fiber fed locations over mountainous terrain.
VELCO required a three hop Microwave Radio System constructed to interconnect several fiber fed locations over mountainous terrain.
At this point Commdex used the detailed equipment information to complete a detailed structural analysis on each vertical asset. Once the structural analysis passed, Commdex developed a detailed bill of materials and began equipment procurement. Concurrently, FCC frequency coordination and licensing was completed for these paths. Commdex then installed the antennas, radios, lines, and inside plant equipment utilizing specialized field teams to achieve timely and efficient deployment of the microwave radio system. For each path, installation of tower equipment was performed to factory specifications, guaranteeing a reliable install despite environmental exposure. Coaxial cable lines were thoroughly tested for compliance. Each path was aligned to within 1.5 dB of calculated targe